The 2020 Sidewalk ADA Compliance Program is starting today. The work will continue to the beginning of June. The work consists of the replacement of catch basins and concrete curbing, sidewalk, and truncated dome pavers at intersections and other miscellaneous locations along the streets to be resurfaced.
To help ensure the safety of the construction workers as well as the traveling public, motorists should follow the posted signs, remain alert, reduce their speed and watch for stopped traffic while passing through the work zone area.
All work is weather permitting.