CSX Railroad Bridge Painting Project

Posted on: August 2nd, 2017 No Comments

 

The CSX Railroad Bridge Painting Project is scheduled to begin the week of August 7, 2017. This project will consist of the surface preparation of the existing structural steel and the repainting of the structural steel, of the CSX Railroad Bridge located over E. Ash Street.

Traffic will be maintained, however, there will be lane closures on E. Ash Street to complete this work.

The anticipated project completion is late August.

The contract was awarded to APBN Inc. of Campbell, Ohio at an estimated cost of $201,770.

To help ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through the work zone area.

All work is weather permitting.

 

 

Comments are closed.

201 W. Water Street, Piqua, OH 45356
City Manager Office: 937-778-2051 | Utilities Business Office: 937-778-2000
© 2016 Piqua, OH       All rights reserved       Site powered by E-Gov Link