Miami County Current Construction for the Week of August 12-18, 2019

Posted on: August 14th, 2019 No Comments

 

The following closures are currently in effect for the week of August 12th – 18th:

• I-75 between CR 25A (Troy) and US 36, Overnight lane closure August 12th at 7 pm – August 13th at 6 am. One lane will remain open in each direction at all times.
• I-75 between Northwoods Boulevard and SR 55, Nightly lane closures July 13th – September 30th between 7 pm and 6 am. These will become double lane closures at 10 pm. One lane will remain open in each direction.

Contact: Mandi Dillon – (937) 497-6820

ODOT closures focus on Interstate, US and State routes. For information on local roads you will need to contact the county, city or township where the road is located. Arrow boards and signs will be in place prior to the work zone to alert motorists of the upcoming closure. All work is weather permitting. Safety is a top priority at ODOT. To help ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through the work zone.

 

Comments are closed.

201 W. Water Street, Piqua, OH 45356
City Manager Office: 937-778-2051 | Utilities Business Office: 937-778-2000
© 2019 Piqua, OH       All rights reserved       Site powered by E-Gov Link
Do NOT follow this link or you will be banned from the site!